MV Soft Rocker    

Building Bulk Heads



|Back to Search|

Frame for first bulkhead pattern


Cardboard pattern first bulkhead


First Bulkhead with safety (collision) bow tank below




Completed bulkhead



  

Chain Locker and Forward Wet Locker



Port bulk head forward side of shower






Forward Wheelhouse bulkhead between head/shower and wheelhouse




Start of aft wheelhouse bulkhead  pattern



Completed aft wheelhouse bulkhead pattern (on right).
Temporary 2 X 4 frame remains in place to support finished bulkhead while
 it is being glassed into place

Transferring aft wheelhouse bulkhead pattern to materials



Bottom of each bulkhead is fiberglass to withstand bilge water if needed

| Back to Top |



Aft Cabin bulk heads in place. (Looking forward from aft cockpit area)



Aft Cabin bulkheads in place. (Looking aft from wheel house area)



Completed bulkheads. (Looking aft from forward cabin area)
| Back to Top |


|Back to Search|
04/07/22 1547 03bulkheads.htm