MV Soft Rocker | Ground Tackle |
| Back To Search | |
Plath
Windless (Repainted with Endura Ex 2C Topcoat) |
|
![]() |
![]() |
Undercoat | Endura Technician |
![]() |
![]() |
![]() |
![]() |
![]() |
|
| Top Of Page | |
Bow Roller and Anchor |
![]() |
![]() |
Bow roller design - test model | |
![]() |
![]() |
![]() |
|
![]() |
![]() |
Taking a mold off of the bow for a bow roller | |
![]() |
![]() |
Mold for bow roller | |
![]() |
![]() |
Filled and fared | Ready for gel |
![]() |
![]() |
Gelled | |
![]() |
![]() |
Lay up done | Fairing Started |
![]() |
![]() |
Initial
Fairing Complete |
Removed
from mold |
![]() |
|
Trimmed |
|
![]() Testing windless and establishing height of opening in bulwark. (anchor stock brakes tape at 8 1/2 inches above deck. |
![]() |
![]() |
![]() |
| Top Of Page | | |
![]() |
![]() |
Opening Cut through bulwark |
Bow roller positioned in opening in preparation
for glassing flange around assembly |
![]() Flange Glassed In place |
![]() |
![]() First trim |
![]() |
![]() |
![]() |
Anchor Rode |
![]() |
|
|
![]() | ![]() |
| |
|