M.V. Soft Rocker
   Aft Deck Construction

|Back to Search|
     

Mold for Aft Deck Hatches
(Brass manhole is from original boat)

Manhole flange held in place in center hatch mold
with white gel "putty".
 Mold is masked and ready for gel


Spraying gel coat

Gel coating complete

Airex core vacuum bagged in place

Two layers of mat glassed over core to make s "sandwich"
(Edges have added Nitex for strength)


Center hatch complete and removed from mold

Mold for aft deck frame.
(Using the hatch mold transfers the camber and
 hatch shape to the frame mold)

Black arborite and plasticine applied to mold

Spraying gel

Mat roving X 2 layup

Layup complete
Horizontal partitions ccompete (white parts)

Frame installed

Hatches in place
                                                                                                                                                            
Non Skid Formula

Undercoat

  • Roberts Gray  (unwaxed)

Top Coat

  • Roberts Gray and Cloud White  (waxed) Gel 50/50
  • 1 Cup Cabosel Per liter
  • Sprayed with Schutz Undercoating Gun 65 PSI
| Back to Search |

04/13/22 
10:33PM  26aftdeck.htm