![]() M. V. Soft Rocker | Tank Construction |
Fuel Tanks |
![]() Mock up of port diesel fuel tank was made to make sure it would fit the space | ![]() Mock up of port tank in place |
![]() Start of mold. (bottom up) | Mold is made of melamine, arborite , plasticine and lots of wax |
![]() Arborite added and held in place with blocks while adhesive is drying | ![]() Corners with radius and strips to form slots for baffles |
![]() Mold filled and waxed | ![]() Ready for spraying PVA and gel. Note flange masked out on top of tank (mold inverted) |
![]() Vinyl Ester gel | ![]() Two layers of fine mat (vail) applied |
![]() | ![]() |
Starboard tank | Port and Starboard tank bottoms complete |
![]() | ![]() |
Test fit below deck aft cockpit.......... | |
Back to Index | |
![]() | ![]() |
Mold with layup completed for baffles | Baffle Material |
![]() | ![]() |
Cardboard Baffle patterns | Fiberglass Baffles cut and in place |
![]() | ![]() ![]() |
Baffles secured with core bond | | Top | |
![]() | ![]() |
Mold for tank lids | Tank lids layed up ready for fittings |
![]() | ![]() |
Lid cut to size with access holes prepared | Glassing in Studs |
![]() | ![]() |
Gel over glass holding studs | Cutting neoprene gasket http://en.wikipedia.org/wiki/Neoprene |
![]() | |
Test fitting tank before final assembly | Testing for leaks with low air pressure and soap (tanks successively held air overnight) |
![]() | ![]() |
Measuring volume with water - 233.5 Liters per tank total 467 | Tanks in place ready for plumbing and final installation |
(Final installation of | fuel tanks below) |
Water Tanks, Gray Water and | Black Water Tanks |
![]() Template for tank mold | ![]() Start of tank mold |
![]() Mold filled and ready for fairing | ![]() Lay up complete |
![]() Two tank bottoms | ![]() Test Fit |
![]() Baffles In Place | ![]() Tanks completed and being pressure tested |
![]() Fittings installed | ![]() Inspection Hatch |
![]() Pressure testing | ![]() Holding tank |
![]() Tanks in place ready to be connected |
| Top | |
![]() Holding Tank | ![]() At left and above, bracket that secures pump out line from back of tank to low point at front. Bracket is attached to center baffle |
![]() Starboard water tank (forward) and holding tank (aft) All tanks have been glassed in place (blocking may not be necessary) | ![]() Port Water tank (below refrigerator/freezer) Water tank capacity is 20.77 Imperial Gallons or 94 liters each |
![]() Port gray water tank | ![]() Water tank(s) plumbing |
![]() Gray water tank inlet and vent | ![]() Water tank(s) filler on left and holding tank pump out (mock up plumbing) |
Fuel Lines ![]() | ||||||
![]() | ||||||
Fuel Tanks Glassed In Place | ||||||
![]() |
![]() | ![]() |
Tank filler and vent recess | Vents are "crossed" so overflow can go into opposite tank filler |
![]() | Fuel pickup tube on left - . fuel pick up lines below |
Port | Starboard |
![]() | ![]() |
Fuel Pick Up Lines - Port | Fuel Pick Up Lines -Starboard |
![]() | ![]() |
Fuel filler, fuel return line and vent line - Port | Fuel filler, fuel return line and vent line - Starboard |
![]() | ![]() |
![]() | ![]() |
Port Tank Fuel Guage Sensor | Starboard Tank Fuel Guage Sensor |
![]() Tank guage (s) panel at helm | |
| ![]() Fuel tank filler hoses, tank vents and bilge pump (aft cockpit outlet |
Recor Parker Fuel Filter Model 500 FG and Six way valve (fuel tank selector) | |
![]() | |
Extra Filter(s) container on left Filter #2010PM - OR 30 Micron | |
![]() | |
Aft Cockpit Deck Non Skid Applied | Hatch Gasket |