M.V. Soft Rocker

Wheelhouse



|Back to Search|

Links to Items on This Page

Wheel House Sole (Hatches over Engine Room)
Companion Way to Forward Cabin
Wheel House Walls
Wheel House Roof
Wheel House Windows
Wheel House Doors
Aft Wheel House Bulkhead and Window Openings
Wheel House Consoles
Overhead Wheel House Console and Head Liner




Wheel House Sole. (Hatches over Engine Room)

 

Removable floor beams

 

....................

Glass detail at floor hull joint


|To Top of Page|




Companion Way to Forward Cabin.


Companionway flanked by part of frame for dashboard

Shower / Head on right (Port Side)

Stairs swing up for access to sump and shower plumbing.

Looking down from wheelhouse into forward cabin


|To Top of Page|

Wheel House Walls.


Lath mock up of starboard wheelhouse wall


Waxing mold



Masking off door and windows



Spraying gelcoat on mold

Gelled Mold ready for core



Fitting airex core


Vacuum bag applying pressure to airex core

Ready for last layers of glass

..............



Completed part in place






Wheel house / forward deck joint port Wheel house / forward deck joint starboard

..........

|To Top of Page|

Wheel House Roof.


Visor mold



Visor mold with mock up of lines attached to roof mold




Spraying visor mold

Construction of Wheel House
Roof Mold


 

Roof mold after it has been gelled


First layers of glass....

.Airex fitted in place.......

Vacuum bagging process begins

Flood coat of resin on core

Final layers of glass to complete "sandwich".

Beams for securing head liner and conduit for wiring.

Out of mold

Modifications to lines

Lifting wheelhouse roof onto boat

Paul, the acrobat (nice to have younger people around)

Lifting the roof into place

Done (fits)
|To Top of Page|

Wheel House Windows.





Window mold built in place (inside view)

Outside view of window mold

Recesses for glass windows

Vacuum bagging  airex into window frame

Airex installed -
.Ready for last layers of glass


Inside glassing complete

Mold removed from outside

Completed view from inside




 

Window recesses trimmed and ready for preparation.
(Visor will be trimmed to match roof camber and window lines)


 

|To Top of Page|


Wheel House Doors.





White gel in mold


first layers of glass

Airex core and mount for lock assembly

Door out of mold with hardware installed



|To Top of Page|

Aft Wheel House Bulkhead.


Mold for bulkhead with opening windows
Spraying gel coat on bulkhead mold
Airex in place, then vacuum bagged


Last layers of glass applied ready to have
mold remo

Mold removed - aft wheel house bulkhead completed. (These windows will open


Window openings cut out (viewed from inside)






|To Top of Page|


Wheel House Consoles.


Cardboard Mock UpsCompleted Frames

Locker face below doors















Instrument Panels
( Spare on hand  for future use )


Port ConsoleTop slides forward to provide more working area
Starboard Console









|To Top of Page|

 

Overhead Wheelhouse Console.


VHF Radio Manual

This search light is mounted on the wheel house roof


|To Top of Page|


Wheel House ergonomics and visibility problems diminished over time

a b
cAugust 2022

|To Top of Page|